Industries · Manufacturing

Access control for manufacturing and production

Restricted production zones, subcontractor management, shifts and attendance integration - one platform for the whole plant.

What goes wrong

Six problems every plant recognises

  • Restricted production zones

    Not every employee needs to reach the production line. Damage caused by someone who should not have been at a machine can run into tens of thousands.

  • Temporary subcontractors

    Technicians, suppliers and quality inspectors need access to one specific area, for a specific window, and to nothing else.

  • Shift overlaps

    A night shift should not still be reaching morning-shift areas two hours after handover. Permissions have to work by the hour, not by the person.

  • Compliance and audit

    Regulators ask for precise entry logs. Assembling them by hand, once a year, is both slow and hard to defend.

  • Payroll disconnected from the gate

    With no link between access and attendance you either pay for hours nobody worked, or absorb overtime nobody approved.

  • Critical assets

    Server rooms, raw-material stores and expensive test equipment need access that is both restricted and documented.

Zone model

Four tiers, and every door belongs to one

Most plants map cleanly onto four tiers. Start here, then split a tier when the building demands it - there is no cap on how many zones you define.

  1. Red Most restricted
    Typical areas
    Server room, lab, control room
    Who gets in
    Managers and IT only
    Rule
    Every entry logged; access granted only on a manager’s approval
  2. Orange Restricted
    Typical areas
    Production line, raw-material store
    Who gets in
    Production staff for that line, plus supervisors
    Rule
    Subcontractors only where named explicitly, never by default
  3. Yellow Partly restricted
    Typical areas
    Finished goods, packing
    Who gets in
    Warehouse and distribution staff
    Rule
    Operating hours only
  4. Green General
    Typical areas
    Main entrance, canteen, car park
    Who gets in
    All employees
    Rule
    All operating hours; entry recorded as attendance

Subcontractors

A pass that expires on its own

The whole point is that nobody has to remember to switch it off.

  1. 1

    Define the access

    One zone, a start and end date, and the hours within those days when the pass works.

  2. 2

    Send a code

    The subcontractor gets a QR code or a PIN. No card to print, no key to hand over, no deposit to chase.

  3. 3

    Watch it as it happens

    Arrival time, time on site and the zones actually entered are recorded while the work is going on.

  4. 4

    Let it close itself

    On the end date the pass stops working. No manual deactivation, so no window where a former contractor still has access.

Shift permissions

Permissions that follow the rota

The same person, the same badge, a different answer at 03:00. Rules are written per area and per shift, so handover is not a security gap.

Area Morning 06:00–14:00Afternoon 14:00–22:00Night 22:00–06:00
Production line A Line team on shiftLine team on shiftLine team on shift
Warehouse Warehouse staffWarehouse staffManagers only
Server room IT onlyIT onlyClosed
Admin offices Managers on shiftManagers on shiftClosed

Anything not granted is closed. A rule is what opens a door, never what closes it.

Evidence

What you can hand to an auditor

  • Reports built for regulators

    Export to Excel, PDF or CSV, filtered by date, person, zone or event type. The 30-second version of what used to take days.

  • Alerts on unusual entry

    An attempt outside permitted hours, or in a zone the person has no rule for, raises an alert immediately rather than surfacing in next month’s report.

  • Camera footage attached

    Each entry record can link to the footage from that door at that moment, so identity is verified rather than assumed.

  • One record for attendance and payroll

    Access data becomes the attendance report directly. No double entry, and no two systems disagreeing about who was on site.

What changes

Before and after a rollout

A composite of what plants like this typically see once zones, subcontractor passes and the door-to-payroll link are in place.

Before

  • Access zones tracked in spreadsheets, with a security officer assigned to maintain them
  • Subcontractors on physical cards, with a few lost every month
  • Deactivation after a contract ended took days, not minutes
  • An annual audit meant days spent assembling reports by hand
  • No payroll link - hours of manual reconciliation every month

After

  • Zones defined in the interface, changed in seconds
  • Subcontractors on QR codes that expire on the project end date
  • Deactivation is one click, so there is no open window at all
  • An annual audit report exports in under a minute
  • Payroll data ready at month end with no manual work

Questions

Asked by plant managers

How do we handle a subcontractor who is on site for one day?
Issue a pass with an expiry: one zone, one day, and the hours within that day. When the window closes the pass stops working on its own, so nobody has to remember to deactivate it.
Will this satisfy our regulator?
You get a complete entry log with a timestamp, an identified person and the zone for every event, exportable for an external audit at any time. Whether that meets a specific regulation is a question for your compliance advisor - we will give them the log format in advance, along with our security documentation.
How many zones can we define?
There is no limit. Plants routinely run separate zones for each production line, raw materials, finished goods, the server room, offices and the main entrance, each with its own rules.
Can permissions differ between shifts for the same person?
Yes - that is the normal case. Rules are written per area and per shift, so the same badge opens the warehouse at 10:00 and does not at 23:00.

Map your plant with us

A 30-minute session where we build your zone structure together, on your floor plan, before you commit to anything.